Vanessa Harris and her husband Dan run Riverbend Hill Country Homes from Dripping Springs, building custom homes and whole-home remodels on Lakeway land that sits inside the city limits, in the surrounding extraterritorial jurisdiction, or across the area's Lake Travis communities. Lakeway is about thirty-five minutes from that base, and they take your build from the first walk to the final punch list.

What We Check on a Lakeway Lot First

Three things can shape a Lakeway build before an architect draws anything. A View Protection Overlay can set your height limit, and even an addition years from now can face review if it would block a protected view. Your water bill can come from one of several providers, depending on the subdivision. On land near Lake Travis, your septic system can answer to the Lower Colorado River Authority rather than to the City or the County. More offices can have a say here than in most towns we build in.

We put all of that in writing before you commit to the lot. We check your parcel against the City's boundary map, confirm whether a View Protection Overlay or a Planned Unit Development ordinance governs the site, identify the water and wastewater providers by address, and price the site work against the slope and soil on your lot before a floor plan exists.

If the overlay, the water and wastewater service, or a community's builder program will not work with the home you have in mind, we say so on the first visit and back that up with the survey and the engineering.

Schedule a Consultation

4.8⭐ on Google
$1.3M featured remodel in San Marcos
Google review from a project architect
Owner-led job sites

The Finish Level We Hold on Every House

These details are from our whole-home remodel in San Marcos, photographed as the project wrapped.

The primary bedroom of the San Marcos project, photographed on completion
The study in the San Marcos whole-home renovation
The pool deck at the finished San Marcos project

Five Offices Can Have a Say in Your Lakeway House

Depending on the property, a project can involve the City, Travis County, a water or wastewater district, the Lower Colorado River Authority, and the community's own architectural committee.

We confirm the city limit line, the View Protection Overlay, your water district, and your septic authority before anything is drawn, so you deal with one point of contact.

Check the City Limit Line Before You Buy the Lot

A Lakeway mailing address does not tell you whether a property sits inside the city limits. We check the City's address-searchable development map before anything else. Properties inside the city limits go through Lakeway's Building and Development Services Department. Properties outside the limits generally go through Travis County, and a parcel in Lakeway's extraterritorial jurisdiction may need review by both. A detached home follows the residential building-permit process in either case, although platting, grading, drainage, and tree requirements can still apply on top of it.

The View Protection Overlay Can Set Your Height Limit

Lakeway's View Protection Conditional Overlay, reviewed by the City's Zoning and Planning Commission (ZAPCO), sets your permitted height before your house is designed, and it can require a fresh review if a later addition affects a neighbor's protected view. In an R-1 district you get one home on the lot, and the roof cannot sit more than about 32 feet above the original ground. On a sloping lot that number decides whether a second story fits. Lakeway also carries several other residential districts and Planned Unit Developments, and a PUD ordinance can override every one of those numbers for a specific lot. We pull the governing ordinance for your parcel before we sketch a roofline.

Your Water Provider Depends on the Subdivision

Being inside Lakeway city limits does not tell you who bills you for water. Lakeway MUD, Hurst Creek MUD, Travis County MUDs 11, 12, and 13, and Water Control and Improvement District No. 17 each serve different parts of the area, and Lakeway MUD draws from Lake Travis rather than groundwater. Rough Hollow and the Highlands of Lakeway are served by the Travis County MUDs, and that service is moving to Lakeway MUD. We confirm current service for your address. Drilling a private well is not prohibited, but the water table has dropped more than 200 feet in places, so we take the question to the Southwestern Travis County Groundwater Conservation District rather than assume a well will serve as backup supply.

Who Treats Your Wastewater, and Who Permits Your Septic

Lakeway MUD operates two treatment plants, one serving eastern Lakeway and one serving the area west of Lakeway Airpark. WCID No. 17 provides wastewater in only part of its service area and confirms availability by address. Inside city limits, the Lower Colorado River Authority permits and inspects septic systems within its Lake Travis jurisdiction, and the City can still require its own construction permit alongside the LCRA approval. If your remodel adds a bedroom or converts a bonus room, we check the new floor plan against your system's permitted capacity before the design is set.

What the Slope and the Soil Add to the Engineering

Lakeway sits on clay loam over limestone in most places, with slopes that commonly reach roughly 40 percent and run steeper near the lake and drainages running through the neighborhoods. The City requires structural stabilization on any slope of 50 percent or steeper, a drop of one foot for every two feet it runs, and any retaining wall over four feet has to be designed by an engineer and drawn into the plans before work starts. Floodplain exposure here is parcel-specific rather than citywide, and inside a mapped floodway, new construction or fill is permitted only when engineering proves it will not raise flood levels anywhere else. We read the slope, the soil, and the flood map on your lot before we price the site work.

Tree Permits, Oak Wilt Season, and the Overnight Lighting Rule

A protected or heritage tree on your lot generally needs its own approval before your building permit can move, unless a stated exemption applies, and the City requires a current tree survey showing every hardwood over six inches in diameter, plus fenced protection around the critical root zone during construction. Oak pruning is restricted from February through June, the oak wilt season. Lakeway also runs a citywide outdoor lighting ordinance: new fixtures must stay under 3000K, the warm end of the scale, anything above 1,000 lumens has to be shielded so the light points down at the ground, and lighting under a covered area has to dim or switch off overnight. We order the tree survey, draw the protection fencing around the root zones we have to keep, and draw the lighting plan to the ordinance.

Where We Build in Lakeway

Name the community and we can usually tell you the same day which office permits a build there, what the architectural review will want, and whether new construction runs through a builder program.

  • Rough HollowIncludes Hacienda Heights, The Peninsula, and Las Brisas Estates; new homesites are assigned to the developer's own custom-builder list, with remodels and additions open on existing homes
  • Flintrock FallsRequires a separate builder application and architectural approval before the neighborhood accepts a plan, on top of the City permit
  • Serene HillsHOA architectural review governs new construction and covered exterior changes; open to the builder you choose
  • Old LakewayThe resident-led area around the original 300 homes built before 1971, where parcel deed restrictions still apply separately
  • The Courtyard at the PreserveArchitectural Review Committee approval is required for any exterior change, in addition to City approval where applicable

Some of these communities restrict new construction to a builder program, and we confirm eligibility for your specific lot before you spend anything on design. Remodels and additions for existing owners usually sit outside those programs.

What a Lakeway Build Costs

We take on two kinds of project in Lakeway, each on its own timeline.

Ground-up

New Custom Home

$325-$800+ / sq ft
  • 14 to 20 months, contract to completion
  • Jurisdiction, water provider, and the View Protection Overlay scoped on the first visit
  • Vanessa and Dan run your build personally, from the first walk to the final punch list
Schedule a Consultation

Whole house

Whole-Home Remodel

$325-$650+ / sq ft of remodeled area
  • 12 to 24 months, typically
  • At least a 20 percent contingency, in writing, from day one
  • Community architectural review carried by us, start to finish
Schedule a Consultation
Kitchen or primary suite (4 to 9 months)$300-$800+ / sq ft

In Lakeway, the per-square-foot number leaves out what differs from one address to the next: which utility district bills you for water and wastewater, whether LCRA or Travis County carries your septic review, whether a separate City permit applies, and how much the slope and the View Protection Overlay add to engineering. The number for your lot comes from walking the property together. See custom home building and luxury home remodeling for how each service runs.

Vanessa Harris and her husband Dan of Riverbend Hill Country Homes

Vanessa and Dan Run Your Lakeway Build

They are on your Lakeway site every week of the build. Anything that comes up on site gets settled while they are standing there. Vanessa handles design coordination and the finish selections. Dan runs the field. The two people who confirm your jurisdiction and your utility provider on the first visit stay your direct point of contact through framing, through the finish work, and at the final walkthrough.

Vanessa built resort spas for hotel brands before this, work where a bad tile edge gets written up before the doors open. Your Lakeway home gets that same eye.

Lakeway Questions

How do I know if my Lakeway lot is inside the city limits or the ETJ?

Check the parcel itself. The City of Lakeway publishes a development map with a solid line for city limits and gray shading for its extraterritorial jurisdiction, searchable by address. Inside the line, the City's Building and Development Services Department reviews zoning and permits through its own Civic Self Service portal. Outside it, Travis County Development Services becomes the permitting authority, and an ETJ parcel also needs a County Basic Development Permit. We confirm which authority applies before anything else.

Does Lakeway limit how tall I can build?

Yes, and the limit is set before you hire an architect. Lakeway's View Protection Conditional Overlay, applied through the City's ZAPCO review, can set the permitted height on covered lots ahead of construction, and it can require review again if a later addition affects a neighbor's protected view. On an R-1 lot the height limit runs near 32 feet, but Lakeway carries several residential districts and Planned Unit Developments, and a PUD ordinance can override that number for a specific lot. We confirm the governing ordinance before we sketch a roofline.

Will my Lakeway home be on city water or a well?

Almost certainly a utility, though which one depends on your subdivision. Lakeway MUD, Hurst Creek MUD, Water Control and Improvement District No. 17, and Travis County MUDs 11, 12, and 13 each cover different pockets of the area, and the county-MUD customers are transferring to Lakeway MUD service. Drilling a well is not prohibited, but the water table nearby has dropped more than 200 feet in places, so we take the question to the Southwestern Travis County Groundwater Conservation District rather than assume a well will serve as backup.

Who handles septic approval for a Lakeway home?

Inside city limits near the lake, it is usually the Lower Colorado River Authority, not the City or County. LCRA permits and inspects septic systems within its Lake Travis jurisdiction, and the City can still require its own construction permit alongside that approval. Outside LCRA's zone, Travis County takes over. Wastewater service from WCID No. 17 covers only part of its district, so we confirm access by address. A remodel that adds a bedroom can also require enlarging the existing system, and we check the system's permitted capacity before the plan is finalized.

Can I remove trees to make room for my Lakeway house?

Protected and heritage trees need a removal permit, and your building permit generally cannot move forward until that approval clears, unless a stated exemption applies. Removing a protected or heritage tree requires an application backed by a current survey documenting hardwoods over six inches in diameter, and construction fencing must protect the critical root zone of any tree you keep. Pruning oaks between February and June, the oak wilt season, is restricted as well. We plan the tree survey before the site plan is drawn.

Do I have to use a preapproved builder in Rough Hollow or Flintrock Falls?

In Rough Hollow, yes, for a new home. The developer assigns each custom homesite to one of three named builders. Flintrock Falls works differently: there is no fixed list, but its design guidelines require a separate builder application, reviewed for experience, finances, and references, before the neighborhood will accept a plan, on top of what the City requires. Remodels and additions on existing homes in either community are open to us.

What does it cost to build a custom home in Lakeway?

New construction runs $325 to $800+ per square foot at comparable finish levels, with structural steel and architectural complexity at the top of the range. In Lakeway, the water and wastewater provider, the LCRA or county septic path, and the site engineering your slope requires all sit outside that range, and we price them after walking your lot.

Talk to Us About Your Lakeway Property

Tell us the subdivision and we will confirm which utility district and which permitting authority apply before you commit.

Call us or send us a message, and we will get back to you.

Vanessa answers this number, weekdays 9 to 5.

Vanessa will call you back within one business day. Weekdays 9 to 5.